Address

Hitech House
Near Gurukul Tower
Gurukul, Ahmedabad - 380052
Gujarat, India

Phone: +91-794-体育OB

Fax: +91-794-000-3202

Email: sales@hitechdigital.com

Engineering

ob体育下载

End-to-end engineering process management helps door manufacturer increase orders by 2x, reducing delivery times by over 70% Banner

Client Profile

A U.S.-based company manufacturing and supplying custom metal and steel doors and frames for over 25 years.

Business Needs .

The company was looking to significantly cut down on engineering time and speed up the delivery of their products. Achieving abilities to assure deliveries within 24 hours for more than 50% of their orders was the plan to get a huge competitive advantage.

Challenges .

Legacy systems and traditional detailed engineering work processes that made custom product deliveries a week-long process, as measurements and customer specifications varied across orders.

New technology investments and continuous training and hiring was going to escalate operations and productions costs, dig into profits, and pose risks of losing competitive advantages and market share.

Solutions and Approach .

Hitech partnered with the client to take on their end-to-end design development processes, and enabled process excellence initiatives to reduce overall engineering time by 80% and achieve 99.7% quality levels. This was achieved in three phases.

End-to-end engineering project management

Through an engineering team, with certifications in metal and steel door designs of different profiles, and expertise in SOLIDWORKS® and DriveWorks®, Hitech offered the following solutions.

  • Concept to manufacture solutions for each customer order, which involved:
    • 3D modeling and representations
    • Drawings, BOM
    • Manufacturing documents
  • Reduced quality issues by above 95%
  • Cut down on engineering time by over 50%
  • Scaled up, managing engineering work for all orders (5000+ per month)
Engineering Process Management

Design Automation

An authorized partner for DriveWorks implementation, Hitech automated design processes, reducing client’s engineering time by over 60%. This second phase involved:

Process Excellence and Continuous Improvement Initiatives

Rising monthly order volume called for systems in place to track orders at individual customer levels. And increased overall quality control time. In response to this, Hitech offered several solutions:

Business Impact .

Share your Challenges Email us!

Call us now!

+91-794-体育OB

Connect with us

Facebook Icon linkedin icon twitter icon
英雄联盟竞猜选手抽注 亿电竞(河北)结果查询 pc28加拿大开奖软件详情 电竞竞猜 YBG电竞下注数据平台(YBG电竞季节APP v6.6) 加拿大28开奖今日官方